Tel:86-756-6162999
86-756 -6162566
Scanning code
Page copyright:2019 Zhuhai Flute Technology Co., Ltd. 粤ICP备19031179号 Website management Website building:China Enterprise Power Zhuhai
PRODUCT
Product Details
Fute Professional Engineering 2000 Interior Wall Paint
product manual |
use |
Fute Professional Engineering 2000 interior wall paint is a series of professional engineering products specially launched by Fluorite's many years of professional engineering paint experience. It not only provides excellent professional construction performance and friendly professional engineering packaging, but also provides good scrubbing and High covering power, safe and environmentally friendly paint film, providing lasting protection for the wall |
Decorate and protect indoor grassroots walls, such as plastered surfaces, plasterboard surfaces, etc. |
Features, advantages |
Performance guide |
Excellent hiding power, you can paint a larger area with a small amount of paint.
Good scrub resistance, providing long-term wall protection.
Good mold resistance
|
Covering power: Excellent.
Scrub resistance: Excellent.
Adhesion: Excellent.
Mildew resistance: Excellent.
|
Painting data:
luster |
Matte |
Painting method |
Rolling, brushing or spraying with medium hair roller |
colour |
white |
Clean |
Soapy water |
Surface dry |
30 minutes @ 25 ° C and 50% relative humidity |
toxicity |
Lead-free, non-toxic dry film |
Repaint |
2 hours or more @ 25 ℃ and 50% relative humidity |
Expiration date |
24 months without opening and 25 ℃ |
Number of coatings |
2 layer |
dilution |
Not recommended or diluted up to 5% in water |
Theoretical coverage:
When the dry film thickness is 25 microns, the theoretical coverage is 8.0-9.0 square meters / kg. The actual coating rate will vary depending on factors such as construction method, construction conditions, surface roughness, and absorbency.
Construction guidance |
Health, safety and environmental information |
The surface to be painted is free of grease, dirt and loose materials. Newly constructed walls need to be completely dry. The moisture content of the wall (or putty) surface must be less than 14%, and the pH value must be less than 10.
New wall:
Newly constructed concrete walls must be allowed to dry for 30 days before the putty can be approved. Putty should not be too soft. After the putty is completely dry, smooth it with fine sandpaper to remove dust.
Old wall:
When repainting the old painted wall, please remove it with a spatula and sandpaper after sanding to remove loose materials and loose paint film. Fill wall defects with appropriate putty.
|
Protective equipment:
Personal protective equipment: Wear protective glasses as appropriate, and wear a suitable filter spray protective mask when sanding and spraying with sandpaper.
Spills:
All spills should be covered with soil or sand. Do not pour paint from the tank into drains or drains. Dispose of used paint in accordance with local environmental regulations.
Health effects:
If it splashes into your eyes, it can irritate your glasses and cause discomfort. Inhalation of the spray during spraying can cause irritation to the respiratory system.
Ensure adequate ventilation during coating and drying。
|
Construction Notes
If necessary, dilute according to the instructions. Avoid excessive dilution. |
Do not sand the last finish. |
Do not apply when the substrate temperature is below 5 ° C or the relative humidity is greater than 85%. |
Transportation and storage
Packing capacity |
25.kg |
Store |
Store at 5 ° C-40 ° C. Frost, sun and rain are strictly prohibited. |
Cargo type |
Non-dangerous goods; no special transportation requirements. |