FTPrlmer210 fluorine special epoxy multifunctional primer base paint
Product description |
Surface treatment |
F210 fluorine special epoxy multifunctional primer is a high performance, multi-purpose, chemically cured two-component epoxy paint with tough film, water resistance, abrasion resistance, collision resistance, resistance to gasoline, fuel oil, lubricants, oil, etc Characteristics of similar substances. Very suitable for galvanized iron surface or other galvanized steel surface, with very good durability and corrosion resistance.
|
All surfaces must be intact, dry and clean, free of grease, dirt, mold release, curing, weathering, welding slag, loose paint films and other foreign matter.
New surface: In order to make the performance of the paint better, the surface of the steel should be sandblasted to reach the standard of Sa2.5-3, and the surface roughness is equivalent to No.3 and BN10a of the Rugotest standard. There should be no sand or dust on the surface. Paint immediately after sandblasting to prevent the surface from rusting or contaminating again.
Old paint surface: The old paint film must be completely removed, and then surface treated with reference to the new surface, at least sandblasted to SSPC-SP10 or SSI-Sa2.5.
|
Use |
Specification data |
F210 fluorine special epoxy multifunctional primer is used as a series of high-performance matching anticorrosive paint. It is an ideal product for steel structures, pipelines, storage tanks, chemical plants, power plants, oil refineries, paper mills, water and sewage treatment plants, etc. |
Color: light gray available in other colors
Gloss: Semi-flat
Volume solids content: about 55%
Theoretical coverage: 11 m² / liter (based on 50 micron dry film)
Flash point:> 26 ℃
Specific gravity: about 1.40 kg / liter
Dry with fingers: about 2-4 hours (20 ° C)
Fully cured: 7 days (20 ° C)
|
Features |
|
Excellent corrosion protection
Immersible in water and salt water
Excellent solvent and chemical resistance in steel or masonry
The surface can also be used as a primer
Ideal for galvanized iron surfaces
Excellent aging recoatability
|
Construction parameters:
The mixing ratio: |
BinderF210-B250:HardenerF210-C910=9:1(Volume ratio) |
Construction method: |
Stir with mechanical stirring for 10 minutes until uniform |
Stir: |
Airless spraying, brushing, roller coating |
Tool cleaning: |
All tools must be cleaned with FT-10 after use |
Thinner: |
FT-10 |
Activation phase: |
8hour(20℃) |
Nozzle size: |
0.019”-0.025” |
Ejection pressure: |
250 kg / cm2 (Airless spray parameters are for reference only) |
Air spray: |
Adjust to suitable viscosity with special matching thinner |
Film thickness: |
Dry film: 50-100 microns |
Repaint interval: |
Minimum: 10 hours (20 ° C) Maximum: see note |
Construction instructions
The construction temperature range is above 10 ° C, and the surface temperature of the steel should also be above 10 ° C. In order to ensure sufficient curing, the relative humidity must not be too high during construction. Application at low temperature can extend its curing time. To avoid moisture condensation, work on dry, clean surfaces with a temperature above the dew point. During construction and drying in narrow places, a lot of ventilation should be provided.
Recoating interval: The recoating interval is related to the subsequent exposure to the environment. The recoating interval at 20 ° C is shown in the following table:
Variety of repainted paint
Epoxy paint series 10 hours 30 days
Chlorinated rubber thick paint 12 hours 24 hours
If the maximum recoating interval is exceeded, the surface of the primer should be roughened to ensure adhesion between the paint films.
Precautions
Ensuring good ventilation in all enclosed areas is of great significance to the safety and performance of the constructors. It is recommended to ventilate the storage tank in two steps. First, pump fresh and dry air into all parts of the storage tank, especially in areas where air cannot flow. Second, use the explosion-proof exhaust fan to extract the solvent vapor in the lowest area of the tank. During the entire application and drying process of the paint, fresh air must be continuously pumped to extract the solvent vapor in the lowest area of the tank to ensure that the solvent completely evaporates from the paint film. The paint film of the storage tank must be cured for 7 days (20 ℃) under ventilation. The lower the temperature, the longer the curing time.
Packaging and storage
Goods type: paint
Packaging specifications: Different packaging specifications are available.
Storage: Store in a cool, dry place, and do not expose to the sun.
Limitation of Liability
The technical data described in this article was accurate to the best of our knowledge at the date of publication, but may be changed at any time without prior notice. We guarantee that our products comply with the descriptions in this article, but do not make any other commitments or warranties, express or implied, including saleable or applicable to special purposes. If there is any liability, it is limited to replacing the product or refunding the purchase price, and will not be responsible for labor, labor costs or other losses caused by it.