• 氟特科技
  • |
  • 氟特科技
  • 氟特科技

Search

PRODUCT

Product Details

Page view
Name

FTZinc-Rich303

F303 fluorine special epoxy zinc-rich primer is a high-performance, two-component zinc-rich primer, which can form a hard and wear-resistant paint film, and provide cathodic corrosion protection for steel structures. Excellent adhesion to inorganic zinc.
没有此类产品
官网
A detailed description

Product description

Surface treatment

F303 fluorine special epoxy zinc-rich primer is a high-performance, two-component zinc-rich primer, which can form a hard and wear-resistant paint film, and provide cathodic corrosion protection for steel structures. Excellent adhesion to inorganic zinc.

All surfaces must be intact, dry and clean, free of grease, dirt, mold release, curing, weathering, welding slag, loose paint films and other foreign matter.
 
New surface: In order to make the paint performance better, the surface of the steel should be sandblasted to meet the Sa2.5 level standard, and the surface roughness is equivalent to No. 3 and BN10a of the Rugotest standard. There should be no sand or dust on the surface. Paint immediately after sandblasting to prevent the surface from rusting or contaminating again.
 
Old paint surface: The old paint film must be completely removed, and then surface treated with reference to the new surface, at least sandblasted to SSPC-SP10 or SSI-Sa21 / 2.

 

Use

Specification data

F303 epoxy zinc-rich primer can be used as workshop primer, can be applied to bare steel surface in new construction or major maintenance works, and can also be used as a field maintenance primer, applied to bare steel or already coated with organic or inorganic Zinc primer surface. The topcoat can be painted with epoxy series, chlorinated rubber series, acrylic series, polyurethane series paint. Can be used for repair of self or inorganic zinc primer. Can be used on steel surfaces in moderate to severe corrosive environments.

Gloss: Flat
 
color: gray
 
Volume solids content: 65%
 
Theoretical coverage rate: 8.1 m 2 / liter (based on 80 ^ m dry film)
 
Flash point: 30 ℃
 
Specific gravity: 1.9 kg / liter
 
Surface dry: 30 minutes @ 20 ° C
 
Dry with fingers: about 2 hours @ 20 ℃
 
Fully cured: 7 days @ 20 ℃
 
Volatile organic compound content (V.0.C): 303 g / L

Features

Excellent corrosion protection, providing cathodic corrosion protection
 
Quick-drying, short application and recoating time
 
Special formula to prevent foaming of topcoat
 
Excellent crack resistance
 
Easy to brush, roll or spray

 

 

 

Construction parameters

 

Mixing ratio

Base material (F188-B205): curing agent (F188-C910) = 4: 1 (volume ratio)

Thinner

FT-10

Construction method

Airless spray

Air spray

Brush

Dilution ratio (approximately the amount of paint)

5%

15%

5%

Activation phase

8 hours(20℃)

Film thickness

Dry film: 50-100 microns

Repaint interval

Chlorinated rubber, acrylic series Min: 6 hours, Max: 3 days
 
Chlorinated rubber, acrylic series Min: 6 hours, Max: 3 days
 
Polyurethane paint series Min: 6 hours, Max: 3 days

 

Construction instructions

 

The construction temperature range is above 10 ° C, and the surface temperature of the steel should also be above 10 ° C. In order to ensure sufficient curing, the relative humidity must not be too high during construction. Application at low temperature can extend its curing time.
 
At the freezing point and below, you should pay attention to the fact that the frozen ice on the surface will affect the adhesion of the paint film, and the temperature of the paint itself should be higher than 15 ℃. To avoid moisture condensation, work on dry, clean surfaces with a temperature above the dew point. During construction and drying in narrow places, a lot of ventilation should be provided.

Recoating interval: The recoating interval is related to the subsequent exposure to the environment. The recoating interval at 20 ° C is shown in the following table:

Variety of repainted paint
 
Epoxy paint series 6 hours 30 days
 
Chlorinated rubber thick paste paint 6 hours 24 hours

If the maximum recoating interval is exceeded, the surface of the primer should be roughened to ensure adhesion between the paint films. Before re-coating the polluted environment, apply high-pressure fresh water to thoroughly clean the surface and allow it to dry. In addition, a hard brush should be used to remove zinc corrosion (white rust).

 

Precautions

Ensuring good ventilation in all enclosed areas is of great significance to the safety and performance of the constructors. It is recommended to ventilate the storage tank in two steps. First, pump fresh and dry air into all parts of the storage tank, especially in areas where air cannot flow. Second, use the explosion-proof exhaust fan to extract the solvent vapor in the lowest area of the tank. During the entire application and drying process of the paint, fresh air must be continuously pumped to extract the solvent vapor in the lowest area of the tank to ensure that the solvent completely evaporates from the paint film. The paint film of the storage tank must be cured for 7 days (25 ° C) under ventilation. The lower the temperature, the longer the curing time.

Packaging and storage

Goods type: paint
 
Packaging specifications: Different packaging specifications are available.
 
Storage: Store in a cool, dry place, and do not expose to the sun.

Limitation of Liability

The technical data described in this article was accurate to the best of our knowledge at the date of publication, but may be changed at any time without prior notice. We guarantee that our products comply with the descriptions in this article, but do not make any other commitments or warranties, express or implied, including saleable or applicable to special purposes. If there is any liability, it is limited to replacing the product or refunding the purchase price, and will not be responsible for labor, labor costs or other losses caused by it.

Corresponding parameter set not found, please add it in property template of background
暂未实现,敬请期待
暂未实现,敬请期待